March 20, 2020
North Loop
admin• Level 2 wet lab with key fob entries
• lab equipment supplied by CMR Doors/Lab
• Offices with a new breakroom and multi stall bathrooms
• Upgrading the power to 2000 amps of 480v power
• Sewer line upgrade to handle future cooling and manufacturing water drainage
• New steel pan poured 3000 sq ft mezzanine to join the existing 3000 sq ft mezzanine with the spec lab under it
Even after all this, it will still leave 70 % of the building to build out the rest of the space as they see fit.
This is the ultimate in turn key properties with no waiting to move in and conduct business and will be separated so the business will not have an interruption during the expanded construction if needed.